FAST TURNAROUND | FREE STANDARD SHIPPING — CONTIGUOUS U.S. | Free Design Service | 3D Design Tool

Categories
Live chat
Call us
800-226-1390
Live chat
Chat Now!
CLOSE

Historicaly

Upload
Cart
Sign in
FREE SHIPPING — CONTIGUOUS U.S.
Airline Friendly
Lifetime Warranty
Call Us 800-226-1390

10x20 Modular FlexZip™ Media Trade Show Booth with S-Curve Panels and TV Mount

  • $1,299.00

rating 0 (0 reviews) View more
Clip-On LED Light
Choose Your Package
Artwork Proof Artwork Proof
Additional Services Additional Services
discount shape All design service fees are completely waived for a limited time.
Expected Arrival Date
Delivery available as early as November 16, 2026, with design approval today.
Artwork Options:
  • unselect Send Artwork Later
Subtotal:

$1,299.00

Secure payments
Your payments on AOM Displays are fully protected with SSL encryption and PCI DSS data security standards.
Product Details

A 10x20 booth configuration for video demos and reception, with an included TV mount and podium counter; screen not included. The setup also includes two 8.3ft S-curve FlexZip™ trade show displays, one 4ft straight FlexZip™ trade show display, a display shelf, and carry bag. LED lights are available as an upgrade and are not included in the current default package.

Features

  • 10x20 FlexZip™ Booth Layout
  • Curved Multi-Panel Backwall Design
  • Integrated Monitor Mount
  • Separate Counter Space for Visitor Interaction
  • Custom Printed Graphics
  • Pillowcase-Style Zippered Graphic
  • Snap-Tube Frame Assembly
  • Tool-Free Setup

What's Included

  • (1) 8.4ft S-Curve FlexZip™ Trade Show Display
  • (1) 7.8ft S-Curve FlexZip™ Trade Show Display
  • (1) 4ft Straight FlexZip™ Trade Show Display
  • (1) Integrated TV Mount
  • (1) Display Shelf
  • (2) Hard Case Podium Counter (with Wheels) 
  • Carry Bag
  • Double-Sided Printing
Specifications
Display Specifications
Product Size 234.65" W x 91.76" H
Counter Size 37.8" W x 37" H x 20" D
Carry Bag Size 31.5" W x 10.4" H x 8.5" D
TV Mount Compatible with 24"–32" TV
Display Shelves Supports Up to 20 lbs per Shelf
Display Weight 99.2 lbs
Graphics and Construction
Graphics Zippered Tension Fabric Graphic
Printing Method High-Resolution Dye-Sublimation Printing
Standard Printing Double-Sided
Materials Fire-Resistant Tension Fabric; Anodized Aluminum Snap-Tube Frame
Installation Freestanding, Tool-Free Assembly
Setup Approx. 1 Hour with 1 Person

Ideal For

  • Trade Shows
  • Exhibitions
  • Client Presentations
  • Product Demonstrations
  • Tourism Promotions
  • Brand Engagement Events
  • Corporate Events

For custom sizes, please email us at [email protected], and we'll assist you with your request.

Reviews
star star star star star 0 (0 reviews)

We'd love to hear your experience.

Write a review and help others make informeddecisions!

5 Stars
0
4 Stars
0
3 Stars
0
2 Stars
0
1 Stars
0

Reviews with images

Showing 0 to 0 of 0 (0 Pages)

There are no reviews for this product.

Frequently Asked Questions FAQ
Is a TV or monitor included with the mount?
No. The current package includes the listed TV/monitor mounting or display structure; a TV, monitor, or media device is not listed as included.
What TV size fits the included mount?
The published TV Mount specification states: Compatible with 32" - 55" TVs, supports up to 30 lbs.
How much weight can each included shelf support?
The published Display Shelves specification states: Supports up to 20 lbs each.
Are LED lights included in the current package?
No. LED lights are not included in the current default package; the current page lists clip-on LED lights as a package upgrade.
No Design Team? Free Design Service - Limited Time
Pick a design, and let us handle the rest.
You May Also Like
Explore more items selected based on your interests. These complementary products are carefully chosen to enhance your shopping experience.